|
PRICES 2012
(Prices in €, do not include VAT)
MOORING RENTAL (1) ITINERANT (2)
|
Length (m)
|
Beam (m)
|
Year
|
Half-year
|
Month
|
Day (High season)
|
Day (low season)
|
|
8
|
3
|
2.022,95
|
1.067,67
|
187,31
|
9,71
|
12,14
|
|
10
|
3,5
|
2.602,90
|
1.373,75
|
241,01
|
14,16
|
17,71
|
|
10
|
4
|
3.100,66
|
1.636,46
|
287,10
|
16,19
|
20,24
|
|
12
|
4
|
3.866,55
|
2.040,68
|
358,01
|
19,43
|
24,28
|
|
12
|
4,5
|
4.061,26
|
2.143,44
|
376,04
|
21,85
|
27,32
|
|
14
|
4.5
|
4.923,75
|
2.598,64
|
455,90
|
25,49
|
31,87
|
|
15
|
4,5
|
5.275,44
|
2.784,26
|
488,47
|
27,32
|
34,15
|
|
15
|
4,7
|
5.375,82
|
2.837,24
|
497,76
|
28,53
|
35,68
|
|
20
|
5,6
|
8.049,95
|
4.248,59
|
745,37
|
45,33
|
56,67
|
|
20
|
6
|
8.495,57
|
4.483,78
|
786,63
|
48,57
|
60,72
|
|
22
|
6,5
|
10.123,89
|
5.343,17
|
937,40
|
57,86
|
72,35
|
|
25
|
7
|
10.317,54
|
5.445,37
|
955,33
|
70,84
|
88,55
|
|
30
|
8
|
13.202,96
|
6.968,23
|
1.222,50
|
97,15
|
121,44
|
(1) Industrial for exhibition only, monthly rent only 10% discount.
(2) Low season, October-April, High Season (May do September)
DRY DOCK
|
From
|
To
|
Year
|
|
<6
|
6,99
|
1.524
|
|
7
|
8
|
1.700
|
STRUCTURE IN HALF-YEARLY, QUARTERLY, AND MONTHLY PAYMENTS
|
To |
Half-yearly
|
Quarterly
|
Monthly
|
|
|
Half-yearly - 2 receipts
|
4 receipts |
12 receipts
|
|
<6 to 6,99
|
769, 62
|
388,62
|
130,81
|
|
7 to 8 |
858,50 |
433,50 |
145,92 |
|
De |
Semestral (incremento 1%)
|
Trimestral (2%)
|
Mensual (3%)
|
|
|
Semestre - 2 recibos
|
Trimestre-4 pagos |
Mes-12 recibos
|
|
<6 hasta 6,99
|
769, 62
|
388,62
|
130,81
|
|
7 a 8 |
856,50 |
433,50 |
145,92 |
HARBOUR WALL
|
Concept
|
Amount
|
|
Dry Dock on harbour wall with trailer (Month)
|
75,52
|
|
Sporting rowing boats (Month)
|
50,00
|
ESPLANADA DÀRSENA DE PONENT
|
Concepte
|
Import
|
|
Hivernada esplanada (m2/mes)
Recàrrec del 5% per la prolongació de l’estada
|
7,02
|
|
Ocupació temporal per exposició en sec (m2/dia)
|
0,25
|
LOCKERS
Rent
|
Monthly Rental
|
Half-yearly rental
|
Annual rental
|
|
67,98
|
389,32
|
741,55
|
Purchase
|
Situation
|
Basic price m2
|
|
Harbour wall locker
|
1.400
|
|
Western basin locker
|
1.400
|
COMMERCIAL PREMISES AND TERRACES
|
Situation
|
Basic price m2/month
|
|
Rivera Premises
|
18,56
|
|
Moll Nord Premises
|
15,48
|
|
Moll Capitania Premises
|
15,56
|
|
Workshops
|
11,81
|
|
Occupation of terraces
|
3,04
|
IMAGE RIGHTS PRICE
|
Time
|
Price
|
|
Maximun two days
|
2.040
|
|
Supplement per day
|
612
|
MARPOL CERTIFICATE MANAGEMENT
|
Concept
|
Basic
|
|
Marpol certificate management, annual charge
|
8,79
|
|
Sewage (max. 100l)
|
8,79
|
|
Blig water (5l.)
|
8,79
|
|
Oli (max. 5l.)
|
8,79
|
|
Solid waste (5kg)
|
8,79
|
COST OF ADDITIONA EQUIPMENT AND SERVICES
|
Sailing equipment and additional servis
|
Import
|
|
Short mooring rope (‹12M) (includes rope, rope holder and U-bolt)
|
195
|
|
Long mooring rope (‹20M) (includes rope, rope holder and U-bolt)
|
225
|
|
Longer mooring rope ( more 20M) (includes rope, rope holder and U-bolt)
|
255
|
|
Propeller release
|
110
|
|
Minimal intervention
|
90
|
|
Change rope guide (include material)
|
60
|
|
Fuel station equipment
|
|
|
Bag of ice
|
2,02
|
|
Miscellaneous equipment and servics
|
|
|
Car park barrier
|
112,07
|
|
Port pennant
|
10,35
|
|
Port cap
|
10,35
|
|
Custody of material confiscated from moorers (€2m2day or part of a day. The maximum custody time is 30 days)
|
3,02
|
DEPOSITS (VAT free)
|
Type
|
Moorer
|
Transit
|
|
Access card
|
15,00
|
35,00
|
|
Socket
|
50,00
|
50,00
|
CONSUMPTION
Monthly minimum (for meter hire and maintenance)
|
Moorer up to
|
Electricity
|
Water
|
|
10m
|
1,89
|
1,08
|
|
12m
|
2,28
|
1,63
|
|
20m
|
3,46
|
3,25
|
|
30m
|
5,04
|
5,42
|
|
Electricity=minimum+meter readingx€o.244/meter step)
|
|
Water=minimum+meter readingx4.144/meter step)
|
|
The corresponding VAT will be applied to these rates and they will be reviewed every si months
|
SEASON TICKETS
Moorers’ Season Tickets
|
Time
|
Base price m2/month
|
|
10-day Season Ticket
|
17,96
|
|
Monthly Season Ticket
|
35,92
|
|
Annual Season Ticket
|
205,78
|
Season Tickets for Premises and Workshops
|
Type
|
Base price
|
|
Annuel season ticket for third parties and others
|
205,78
|
External Season Tickets
|
Time
|
Base price m2/month
|
|
Monthly Season ticket
|
67,10
|
OWNERSHIP CHAGE PROCEDURE COST
|
Type
|
Base price/m2
|
|
Procedure for changing mooring ownership
|
5,16
|
|
Procedure for changing premises ownership
|
5,16
|
|
Procedure for changing locker ownership
|
5,16
|
SERVICES
|
Trailer parking (more than one day) 4,40
|
PORT ACCESS RIGHTS
|
Type
|
Basic
|
|
Stay in port per minute
|
0,0188
|
|
Stay in port per day
|
10,37
|
|
Access with vehicle with excess tonnage (more than 10T.)
|
2,36
|
|
Access with vehicle with excess tonnage (10T. to 20T.)
|
4,72
|
|
Access with vehicle with excess tonnage (20T. to 30T.)
|
9,44
|
|
Access with vehicle with excess tonnage (30T. to 40T.)
|
14,17
|
|
Access with vehicle with excess tonnage (40T. to 50T.)
|
18,89
|
|
Access with vehicle with excess tonnage (more than 50T.)
|
33,06
|
COST FOR TRANSFERRRING PREFERENTIAL USE OF MOORINGS
(SALE PRICES)
|
Length (m)
|
Beam (m)
|
m2
|
Basic price m2
|
Basic price for mooring
|
|
10
|
3,5
|
35
|
1.000,00
|
35.000,00
|
|
10
|
4
|
40
|
1.260,45
|
50.418,00
|
|
12
|
4
|
48
|
1.300,00
|
62.400,00
|
|
12
|
4,5
|
54
|
1.260,45
|
68.064,30
|
|
14
|
4.5
|
63
|
1.260,45
|
79.408,35
|
|
20
|
5,6
|
112
|
1.000,00
|
112.000,00
|
|
20
|
6
|
120
|
1.260,40
|
151.248,00
|
|
22
|
6,5
|
143
|
1.260,40
|
180.237,20
|
|
25
|
7
|
175
|
1.260,45
|
220.578,75
|
BOATYARD (Movement operations with Travelift, Crane or Forklift truck)
|
From
|
to
|
Movement
|
Stay
|
Insurance
|
Waste
|
Quay
|
|
|
5,99
|
51,20
|
3,84
|
8,44
|
5,01
|
1,92
|
|
6
|
6,99
|
63,93
|
4,76
|
9,85
|
5,85
|
2,38
|
|
7
|
7,99
|
78,19
|
5,80
|
11,26
|
6,68
|
2,90
|
|
8
|
8,99
|
94,13
|
6,96
|
12,67
|
7,52
|
3,48
|
|
9
|
9,99
|
111,92
|
8,23
|
14,08
|
8,36
|
4,12
|
|
10
|
10,99
|
131,74
|
9,65
|
15,49
|
9,19
|
4,82
|
|
11
|
11,99
|
153,79
|
11,21
|
16,90
|
10,03
|
5,60
|
|
12
|
12,99
|
178,28
|
12,94
|
18,31
|
10,86
|
6,47
|
|
13
|
13,99
|
205,45
|
14,84
|
19,72
|
11,70
|
7,42
|
|
14
|
14,99
|
235,54
|
16,94
|
21,13
|
12,54
|
8,47
|
|
15
|
15,99
|
268,84
|
19,24
|
22,54
|
13,37
|
9,62
|
|
16
|
16,99
|
305,65
|
21,77
|
23,95
|
14,21
|
10,88
|
|
17
|
17,99
|
346,30
|
24,55
|
25,36
|
15,05
|
12,28
|
|
18
|
18,99
|
391,13
|
27,60
|
26,77
|
15,88
|
13,80
|
|
19
|
19,99
|
440,55
|
30,95
|
28,18
|
16,72
|
15,47
|
|
20
|
20,99
|
494,97
|
34,60
|
29,59
|
17,56
|
17,30
|
|
21
|
21,99
|
554,85
|
38,61
|
31,00
|
18,39
|
19,30
|
|
22
|
22,99
|
620,69
|
42,99
|
32,41
|
19,23
|
21,50
|
|
23
|
23,99
|
693,03
|
47,77
|
33,82
|
20,07
|
23,88
|
|
24
|
24,99
|
772,45
|
53,01
|
35,23
|
20,90
|
26,50
|
|
25
|
25,99
|
859,59
|
58,70
|
36,64
|
21,74
|
29,35
|
|
26
|
26,99
|
955,15
|
64,92
|
38,05
|
22,57
|
32,46
|
|
27
|
27,99
|
1.059,88
|
71,71
|
39,46
|
23,41
|
35,85
|
|
28
|
28,99
|
1.174,59
|
79,10
|
40,87
|
24,25
|
39,55
|
|
29
|
29,99
|
1.300,16
|
87,14
|
42,28
|
25,08
|
43,57
|
SURCHARGES AND ADDITIONAL SERVICES
|
Insurance surcharge for the operation 1,41 meter lineal
|
|
Waste 0,84 meter lineal
|
|
Suspension and boatyard movements, first hour70€of price, 2nd and subsequent, 50% of price
|
|
Long stays (2nd month 10% discount, 3rd and subsequent months 20% discount on price)
|
|
Catamarans = Price x 1,5
|
|
EMERGENCIES (Outside boatyard opening hours)=50% surcharge on price
|
|
Use of paint shop 40% increase on stay for boat. Not including electricity and water services
|
|
Use of outside boatyard lifting machinery
|
|
Crane and lift (per operation, not boat. Insurance and waste treatment must be included, if appropriate (per operation, not bo 51,20
|
|
Stay for Rig ask about boatyard
|
EXTERNAL PRICES
|
Type
|
Basic
|
|
Use of boatyard space by external professionals, per month
|
600
|
|
Use of boatyard space by external professionals, per day
|
15,18
|
TRAILES PRICES
|
Type
|
Basic
|
|
Boat trailer from outside port (limited according to regulations)
|
134,19
|
|
Boat trailer inside port
|
41,29
|
SLIPWAY PRICE
|
Use of Slipway
|
Basic
|
|
14,24
|
|